Manufacturing Process
- home
- -
- Manufacturing Process
From Mold to Shipment: Your End-to-End Solution
Single-Source Precision Die Casting with Full In-house Control.
CAD/CAE Simulated flow channel system, thermal balance control
-Mold opening only takes 28-35 days
Vacuum assisted+intelligent temperature control system
-Full coverage of single weight products ranging from 0.5g to 4000g
-25s fast cycle
Five axis linkage machining center
-Japanese FANUC system
Automated polishing by robotic arm Manual polishing
-Level 10 smoothness
-100+polishing workers
Environmentally friendly trivalent chromium process
-Compliant with RoHS standards
-Three inspections
-IATF 16949 system
Anti static workshop
From Mold to Shipment: Your End-to-End Solution
OEM/ODM customization capability
R&D: Equipment throughout the entire process (production equipment/R&D equipment/quality inspection equipment)/R&D center/raw material selection, etc
Wire cutting, EDM machine tools, die-casting machines, CNC, Automatic&manual polishing machine, electroplating line, powder coating line, spray painting line, PVD line, salt spray tester, material analyzer, coating thickness tester, 3D coordinate instrument
Service Value (24-hour Customer Service System/Product Solution Case)
Delivery cycle (time nodes for goods delivery)
Mold opening takes 30-35 days, and bulk orders take about 30 days.
Digital value (core data such as annual production capacity/number of customers served/product qualification rate)
FAQ
Why are the prices of the same shape products very different?
What's your delivery time?
Can you produce customized products?
Sure, we can provide a complete set of customization solutions for you as below:
● Laser print your LOGO on the product upon your permission.
● Customize the packaging based on your requirements.
● Based on existing parts, we can recommend new styles for you.
● Endogenous output samples in 20 working days upon a piece of engineering design drawings.